Memorabilia

2022

On January 16th, the ignition of sintering machine 1 # was successfully hot tested

On May 19th, the 1 # blast furnace was successfully pressurized and leak tested

On June 25th, the hot test of sintering machine # was successfully started

On August 15th, the 1 # blast furnace successfully ignited during the hot test

Successful hot test of medium-sized steel on August 25th

2021

In April, the Group won the title of "exemplary organization for Emergency Management and Safe Production in 2020"

On August 21st, the 100000 cubic meter converter gas holder successfully completed its roof lowering

On August 22nd, the single unit test run of the 2 # converter in the steelmaking project was successful

On August 23rd, the closing of two 180mva transformers in the 220kv substation was completed

On September 16th, the gas power generation project successfully transmitted electricity once

On December 22nd, the hot test of 2 # blast furnace was successfully ignited

On December 24th, the first phase of steelmaking was successfully hot tested

On December 26th, the 850 strip steel project was successfully hot tested

2020

On August 10th, the blast furnace project began construction

Steel making project starts on August 25th

220KV substation project started on September 1st

On September 26th, the 40000 oxygen production project began construction

On September 30th, the 80MW power generation project began construction

On October 9th, the 80MW power generation project began construction

On October 23rd, the group company passed the MCC certification

2019

On April 1st, the daily average power generation of waste heat power generation increased to 130000 kWh

Hebei Charity Foundation was established on June 25th

On August 23rd, the North China Section Steel Strategy Seminar and Information Exchange Meeting were held at the Group Company

In November, the technology center of the group company was promoted to "Hebei Province Enterprise Technology Center“

2018

Launch of Environmental Enterprise Greening Project in March

Recognized as one of the top ten industrial enterprises and advanced enterprise in the integration of industrialization and industrialization in May

In May, H-beam won the honorary title of a well-known brand in Hebei

Becoming a member unit of the China Green Development Alliance in June

Complete deep treatment of denitrification, whitening, and power generation flue gas desulfurization in October

Becoming a strategic partner with North China University of Technology in November

Certified by the municipal technology center in November

Received the honorary title of National High tech Enterprise in December

2017

80MW generator set put into operation in April

Optimization Project for Equipment and Logistics Launch of the Company in July

Conduct energy performance improvement diagnosis with Tsinghua Tongfang in August

The heating project for blast furnace slag flushing water was put into operation in November

Successfully recognized as a Hebei C-level R&D institution in December

2016

700 strip steel production in March

H-beam passed MC certification in October

2014

The sewage treatment station will be put into use in April

H-beam passed European standard certification in September

2013

In June, the testing center passed laboratory accreditation

Passed JIS certification for H-beam products in July

30 MW power generation put into operation in September

Production of ultrafine powder in September

2012

On January 1st, the 2 # converter in the southern district was put into operation

On March 27th, the 320 sintering machine was put into operation

March 31st 1080 blast furnace ignition air supply

H-beam production on April 30th

Production of slag powder in April

June 30000 oxygen production put into operation

Two high-speed lines put into operation in September

2009

Renamed Hebei Tianzhu Steel Group Co., Ltd. in April

3 # blast furnace put into operation after technical renovation in July

July Steel Rolling Line 2 completed and put into operation

2008

On January 2nd, the 3 # converter was put into operation

10000 oxygen production put into operation on May 3rd

Passed ISO14001 and ISO18001 system certification in October

1 # blast furnace put into operation after technical renovation in November

2 # blast furnace put into operation after technical renovation in December

2006

On April 10th, the 110KV substation was put into operation

On April 13th, the 84 m2 sintering machine was put into operation

On April 25th, the 2 # converter was put into production

In May, two sets of 6500 oxygen production were put into operation

November 21st Hot Load Test Run for Steel Rolling

2005

On February 14th, the lime kiln was put into operation

On May 17th, 3 # blast furnace ignition and air supply

2004

On October 15th, 1 # blast furnace ignition air supply

October 20th sintering machine ignition production

On October 30th, 2 # blast furnace ignition air supply

On November 18th, the 1 # converter was put into operation

4500 oxygen production put into operation in November

2003

Initiate the establishment of Tangshan Tianzhu Iron and Steel Group Co., Ltd

2002

Establishing Tangshan Hengtai Steel Co., Ltd

1996

Establishing Yushun Longgong Trading Co., Ltd